Hämeenlinna Central Hospital
– Piping and installation of IV-machines in the department
– Pipe sizes DN25-DN150, rst, black
– 7 IV machines together
– Cooling system connected to LTO
– Project duration 12 months
– Piping and installation of IV-machines in the department
– Pipe sizes DN25-DN150, rst, black
– 7 IV machines together
– Cooling system connected to LTO
– Project duration 12 months
– Subcontracted to Sciotec OY
– Pipe sizes DN100-DN300
– Project duration 2.5 months
– System output after expansion 3.5MW
– IV-machinery piping
– Pipe sizes DN100-DN250, rst
– Hybrid cooling system. Delivered as a subcontractor of Koja OY
– Pipe sizes DN75-DN150
– Length of lines approx. 300 m, some of them installed in the ground.
– Project duration 2 months.