Expansion of the cooling system in the East Centre (Helsinki) Leave a Comment / Uncategorized / By admin Subcontracted to Sciotec OY. Pipe sizes DN100-DN300 Project duration 2.5 months System output after expansion 3.5MW
BASF Harjavalta Battery Materials Production Plant - IV-machinery piping - Pipe sizes DN100-DN250, rst